- Please note

Please note our offices and warehouses will be closed on Good Friday and Easter Monday. Orders placed before 4:30pm on 28th March 2024 will be processed as normal, however we are unable to guarantee delivery next day as our external couriers operate on a working day service. Orders placed after 4pm or during the Easter period will be processed on 2nd April 2024.

Home » Case Study: West Malling C of E Primary School
Image Full

West Malling C of E Primary School

Image FullImage Full

West Malling C of E Primary School

West Malling C of E Primary School contacted NBB looking for an all-weather outdoor area for their key stage 1 children. Our site survey team visited the school and met with the Site Manager, Mike Shield. Upon consultation with Mike and his team, NBB recommended a Wall Attached Winterbourne. Installation works commenced keeping any disruption to the school to a minimum and we are thrilled with the Walkway. 'The professionalism of NBB was clear from the initial site visit. The surveyor listened to our requirements and provided the best suited quotation and design. The overall customer service was excellent throughout the whole period. The installation team were also excellent and friendly and left the site each day very tidy and clean’ comments Mike Shield, Site Manager.

Or Call 0800 1777 052 for more information

Image Full

CAD DRAWINGS
available on request

Image Full

INSTALLATION
available for shelters

Image Full

PLANNING PERMISSION
assistance

Image Full

MANUFACTURED
in the UK