We recently helped a large secondary school to create 500sq ft of storage from what was an open area. Our standard canopy/walkway was adapted to cover an open area with buildings on three side. The canopy was pitched to run onto an existing roof and thus required no further drainage. Quick to erect and a cost effective design, the gain to the school was immediate.